•  Retrait en 2 heures
  •  Assortiment impressionnant
  •  Paiement sécurisé
  •  Toujours un magasin près de chez vous
  •  Retrait en 2 heures
  •  Assortiment impressionnant
  •  Paiement sécurisé
  •  Toujours un magasin près de chez vous
  1. Accueil
  2. Livres
  3. Sciences humaines
  4. Economie & Management
  5. Management
  6. Gestion de projet
  7. Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 15.2

Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 15.2

2-day training course handout and student workshops

Paul E Harris
Livre broché | Anglais
78,45 €
+ 156 points
Livraison 2 à 3 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

This book has been superceeded by Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 16: 2-day training course handout and student workshops - ISBN 9781925185812.

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software.


This book is designed as a student handout for a two-day training course and may also be used as a self-teach book. This course objectives are to teach participants:

- The user interface,

- How to create a projects,

- Scheduling projects without resources,

- Filters, Views, Sorts and Printing,

- Creating and assigning a baseline and

- Updating an un-resourced project.


Most chapters are reinforced by student workshops.


This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
214
Langue:
Anglais

Caractéristiques

EAN:
9781925185751
Date de parution :
01-10-20
Format:
Livre broché
Format numérique:
Trade paperback (VS)
Dimensions :
216 mm x 279 mm
Poids :
508 g
Librairie Club

Seulement chez Librairie Club

+ 156 points sur votre carte client de Librairie Club
Cadeau

Gagnez le double de points

sur nos best-sellers
Cadeau
Points doublés
Standaard Boekhandel

Les avis

Nous publions uniquement les avis qui respectent les conditions requises. Consultez nos conditions pour les avis.