•  Retrait en 2 heures
  •  Assortiment impressionnant
  •  Paiement sécurisé
  •  Toujours un magasin près de chez vous
  •  Retrait en 2 heures
  •  Assortiment impressionnant
  •  Paiement sécurisé
  •  Toujours un magasin près de chez vous

Critical Path

R Buckminster Fuller
Livre broché | Anglais
37,45 €
+ 74 points
Livraison 2 à 3 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

Critical Path marks the masterwork of one of the finest minds and most significant thinkers of the modern age

R. Buckminster Fuller is regarded as one of the most important figures of the 20th century, renowned for his achievements as an inventor, designer, architect, philosopher, mathematician, and dogged individualist. Perhaps best remembered for the Geodesic Dome and the term "Spaceship Earth," his work and his writings have had a profound impact on modern life and thought.

Critical Path is Fuller's master work--the summing up of a lifetime's thought and concern--as urgent and relevant as it was upon its first publication in 1981. Critical Path details how humanity found itself in its current situation--at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises.

The crowning achievement of an extraordinary career, Critical Path offers the reader the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
512
Langue:
Anglais

Caractéristiques

EAN:
9780312174910
Date de parution :
15-02-82
Format:
Livre broché
Format numérique:
Trade paperback (VS)
Dimensions :
155 mm x 226 mm
Poids :
589 g
Librairie Club

Seulement chez Librairie Club

+ 74 points sur votre carte client de Librairie Club
Cadeau

Gagnez le double de points

sur nos best-sellers
Cadeau
Points doublés
Standaard Boekhandel

Les avis

Nous publions uniquement les avis qui respectent les conditions requises. Consultez nos conditions pour les avis.