•  Retrait en 2 heures
  •  Assortiment impressionnant
  •  Paiement sécurisé
  •  Toujours un magasin près de chez vous
  •  Retrait gratuit dans votre magasin Club
  •  7.000.0000 titres dans notre catalogue
  •  Payer en toute sécurité
  •  Toujours un magasin près de chez vous

Price-Based Commitment Decisions in the Electricity Market

Eric Allen, Rick Lindberg, Marty Brenner, Marija D Ilic
Livre relié | Anglais | Advances in Industrial Control
151,45 €
+ 302 points
Format
Livraison 2 à 3 semaines
Passer une commande en un clic
Payer en toute sécurité
Livraison en Belgique: 3,99 €
Livraison en magasin gratuite

Description

1 Introduction.- 2 The Unit Commitment Problem.- 2.1 Unit Commitment in a Regulated Industry.- 2.2 Present Unit Commitment Solution Methods.- 2.3 Interruptible Service Contracts.- 3 Unit Commitment in a Deregulated Environment.- 3.1 Possible Formats for the Electricity Market.- 3.1.1 The Poolco Marketplace.- 3.1.2 The Market of Bilateral Contracts.- 3.2 Unit Commitment for an Individual Supplier.- 3.2.1 Bilateral Market.- 3.2.2 Poolco Market.- 3.3 Multiple Generation.- 3.4 Secondary Market for Reliability.- 3.5 Other Issues.- 4 Survey of the Dynamic Programming Formulation.- 4.1 Finite Horizon Problems.- 4.2 Infinite Horizon Problems with a Discount Factor.- 4.3 Stochastic Shortest Path Problems.- 4.4 Average Cost per Stage Problems.- 5 Unit Commitment for an Individual Power Producer.- 5.1 Unit Commitment without Generation Limits.- 5.2 Unit Commitment with Generation Limits.- 5.2.1 Truncated Normal Distributions.- 5.2.2 Truncated Lognormal Distributions.- 5.2.3 Expected Profit of Generation.- 6 Price Process of Electricity.- 6.1 Price Process Models.- 6.1.1 Long Term Model Behavior.- 6.1.2 Price Models using Logarithms.- 6.1.3 Unit Root Tests.- 6.1.4 Application of Unit Root Test to PJM Electricity Data.- 6.2 Correlation of Price with Load.- 6.2.1 Expanded Price Process Models.- 6.2.2 Test for Mean Reversion.- 6.2.3 Price Prediction Algorithms.- 6.3 Correlation of Load with Date.- 6.4 Correlation of Load with Temperature.- 6.4.1 Overview of Linear Regression Analysis.- 6.4.2 Application of Regression to Temperature/Load Data.- 6.4.3 Conclusions of Regression Analysis for Load vs. Temperature.- 6.5 Effects of Variance of Load Estimation.- 7 Computational Complexity of Unit Commitment.- 7.1 Dynamic Programming Algorithm.- 7.2 Heuristic Simplifications.- 7.3 Ordinal Optimization.- 7.3.1 Overview of Ordinal Optimization.- 7.3.2 Application to Unit Commitment.- 7.4 Example.- 7.4.1 Solution by Dynamic Programming.- 7.4.2 Solution by Ordinal Optimization.- 8 Forward Contracts and Futures.- 8.1 Forward Contracts.- 8.2 Producer Profits with Forward Contracts.- 8.3 Forward Contract Strategies.- 8.3.1 One Hour Forward Contracts.- 8.3.2 Multi-Hour Forward Contract.- 8.3.3 Example.- 8.4 Temporal Forward Contract Problem.- 9 Reserve Markets for Power System Reliability.- 9.1 General Form of a Reserve Market.- 9.1.1 Payment for Power Delivered.- 9.1.2 Payment for Reserve Allocated.- 9.1.3 Price Process for Reserve Price.- 9.2 Individual Power Producer Strategies for Selling Reserve.- 9.2.1 Payment for Power Delivered.- 9.2.2 Payment for Reserve Allocated.- 9.3 Provision of Reserve for Transactions.- 9.4 Effect of Reserve Market on Unit Commitment.- 9.5 Example.- 10 Unit Commitment in Congested Transmission Systems.- 10.1 Probabilistic Model of Congestion.- 10.1.1 Modifications to Price Model.- 10.1.2 Congestion Model with Limits.- 10.2 Producer Strategy under Congestion.- 10.3 Example.- 10.4 Solution of Unit Commitment under Congestion and Reserve.- 11 Conclusions.- A Calculation of Parameters for Price Processes.- A.1 Exponential of a Normally Distributed Variable.- A.2 Nonlinear Least Squares Regression.- A.3 Recursive Least Squares Algorithm.- B Results of Regression of Load vs. Temperature.- B.1 Regression on Same Day High Temperature.- B.2 Regression using Previous Day's High Temperature.- C Derivation of Formulas for Truncated Random Variables.- C.1 Truncated Normal Distributions.- C.2 Truncated Lognormal Distributions.- D Software for Unit Commitment.- D.1 Dynamic Programming Software.- D.2 Ordinal Optimization Software.- D.3 Reserve and Congestion DP Software.- D.4 Source Code for uci2. c.- D.5 Source Code for ucool. c.- D.6 Source Code for uci2rs. c.- D.7 Source Code for uci2con. c.- D.8 Source Code for ucerr.h.- D.9 Source Code for ucerroo. h.- E Stochastic Unit Commitment in a Regulated Industry.- E.1 Unit Commitment with a Finite Horizon.- E.2 Solution of Optimal Power Flow.- E.2.1 Uncongested, Lossless Optimal Power Flow wi...

Spécifications

Parties prenantes

Auteur(s) :
Editeur:

Contenu

Nombre de pages :
264
Langue:
Anglais
Collection :

Caractéristiques

EAN:
9781852330699
Date de parution :
10-12-98
Format:
Livre relié
Format numérique:
Genaaid
Dimensions :
156 mm x 234 mm
Poids :
544 g
Librairie Club

Seulement chez Librairie Club

+ 302 points sur votre carte client de Librairie Club
Cadeau

Uniquement dans nos magasins : paire de chaussettes offerte

à l'achat d'un livre YA ou d'un jeu participant
Cadeau
Paire de chaussettes offerte
Cadeau

Uniquement dans nos magasins : kit créatif offert

à l'achat d'un livre jeunesse ou d'un jeu participant
Cadeau
Kit créatif chouette
Standaard Boekhandel

Les avis

Nous publions uniquement les avis qui respectent les conditions requises. Consultez nos conditions pour les avis.